The paving surface of the geogrid should be relatively flat. After the paving layer has passed the acceptance, in order to prevent the longitudinal skew phenomenon, first draw a white line or hanging line on the paving layer according to the width, and then start the paving, and then use iron Fix the end of the grille with nails (8 nails per meter width, fixed at an even distance), after fixing the end of the grille, use a paving machine to slowly pull the grille forward, and carry out manual labor for every 10 meters long. Tighten and straighten once until one roll of grille is finished, and then lay the next roll. The operation is the same as before. After laying one roll, use a 6T-10T road roller to roll it from the starting point to the forward direction. ( Such as paving on the middle surface layer and leveling layer, it is appropriate to use a steel roller road roller; if the grille is directly laid on the concrete road, it is appropriate to use a rubber roller road roller.After the length of the section where the grille should be laid, check the paving quality as a whole, and then lay the next section. When the next section is laid, the grille and the grille can be overlapped with a length of 10-15CM. , and fix it with iron nails or wooden wedges and continue to lay the second section in the forward direction, and so on. The operation requirements are the same as before.